CLM is the General Contractor on this project which consisted of a 6 month timeframe with Mass Grading, Channelization, Installation of Geocomposite drainage mats and installation of both pre-cast and cast-in-place box culverts.
| CLEAR & GRUB | MASS GRADING |
| CHANNELIZATION | BOX CULVERTS |
| EROSION CONTROL FABRIC | PAVING |